13 Huon Grove, Ashburton
13 Huon Grove, Ashburton, VIC
Details
- Project LocationAshburton
- Expected CompletionQ4 2025
- Project StatusUnder Construction
- Project TypeTownhouse
VCE ranked Ashwood High School Zone, More than 32SQ Interior, Over 320 sqm Land, Moments Away from Alamein Station, Surrounded by Parks!
Project Feature:
Victoria’s Top primary school and most sought-after VCE ranked Ashwood High school zone
Moments away from Alamein Station and surrounded by parks.
Over 320 sqm of land space, including more than 32SQ indoors - 4 bedrooms and 3.5 baths, with indoor and outdoor entertaining areas, with a master bedroom on both the upper and lower floors.
Premium Inclusion:
190mm wide engineered timber flooring in living areas on both floors and on the staircases, with carpeting in the bedrooms.2.3m high timber doors, a color intercom system, a remote-controlled garage door, and LED lighting throughout. Ducted heating and air conditioning, as well as a gas hot water system.
Kitchen with Bosch 900mm and 600mm gas cooktops, 900mm undermount and 600mm pull out rangehoods, 600mm under bench electric oven and dishwasher, 2 pac kitchen cabinets, 20mm stone benchtops with 60mm edge, waterfall island and glass splashbacks.
Bathroom with 300x600 tiles to ceiling, wall-hung 2 pac vanity, 20mm thick stone benchtop with 60mm edge, semi-inset basin, matte black tapware, and inset bath.
Premium Location:
Victoria’s Top Solway Primary School (3 mins) and VCE top-ranked sought-after Ashwood High (5 mins) school zone
450m to Alamein Station, 950m to Gardiner Creek Trail
3 mins to Ashburton Shopping Centre and Woolworths
4 mins to Chadstone Village Shopping Centre and Homeplus+ Homemaker Centre
5 mins to Holmesglen College (Chadstone Campus)
7 mins to top Caufield Grammar School (Malvern Campus), Presbyterian Ladies College and Chadstone Shopping Centre.
Details
- Project Name:13 Huon Grove, Ashburton
- Project Type:Townhouse
- Project Status:Under Construction
- Address:13 Huon Grove, Ashburton, VIC
- Price Range (AUD):2.695 - 2.75m
- Expected Completion:Q4 2025